Skip to content
Corrales · Los Ranchos · North Valley · Rio Rancho Estates · PlacitasSeptic questions? (505) 510-5271
Septic service · Corrales & the valley

Septic Permits

New and replacement septic systems in New Mexico need a state permit. We take care of it.

Call (505) 510-5271
  • Site visits
  • Permit handled
  • Written pricing
Diagram: conventional septic system from the house sewer line to the tank, distribution box and drain field
From the house to the drain field.

The state permit

Onsite wastewater systems in New Mexico are permitted by the New Mexico Environment Department. The permit approves the system type, size and location based on the site evaluation and design.

What we prepare

  • Site evaluation results
  • A site plan with the house, well, ditches, tank, field and setbacks
  • System design and sizing
  • The application itself
Finished graded yard with two green septic tank lids at ground level beside a home
Finished: lids at grade, yard regraded.

Inspection

The system is inspected before it's covered. After it passes, we backfill and grade.

Village rules

Corrales has its own planning and zoning rules for building on a lot. Septic is permitted by the state, but your overall project may involve village approvals too. We'll help you sort out what applies.

Common questions

Can work start before the permit?

No — we wait for approval.

How long do permits take?

It varies; we'll give you an estimate.

Does a repair need a permit?

Many do, and replacements do. We'll confirm.

Keep reading

Need a septic system in the valley?

Corrales, Los Ranchos, the North Valley, Rio Rancho Estates and Placitas.

Call (505) 510-5271
Call (505) 510-5271